Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›The Netherlands: Windcat Workboats Launches Its New Catamaran
Shipbuilding

March 26, 2012 · about 14 years ago

The Netherlands: Windcat Workboats Launches Its New Catamaran

Windcat Workboats launched Windcat 28 this month. Windcat 28 is a vessel in the MK 3 series, an 18m aluminium catamaran specifically designed for the offshore wind industry which was built in Kuipers Woudsend ship yard in the Netherlands. Windcat 28 is 18.0m in length over all and has a beam of 6.1m

1 minutes read
  • LinkedIn
  • X
  • Email

Windcat Workboats launched Windcat 28 this month. Windcat 28 is a vessel in the MK 3 series, an 18m aluminium catamaran specifically designed for the offshore wind industry which was built in Kuipers Woudsend ship yard in the Netherlands.

Windcat 28 is 18.0m in length over all and has a beam of 6.1m and a draft of 1.8m. She is powered by two MTU 2000 M72 V8 engines driving variable pitched propellers giving a maximum speed of 30 knots and service speed of 27 knots combining high performance with fuel economy.

Windcat 28 is built according to MCA SCV code category 2, GL class (GL + 100A5 HSDE III Workboat MC Overbar). She is the second Windcat to be GL classified and meets all the German flag state requirements, so able work in German and other northern European waters.

All the vessel’s navigation and radio equipment is Wheelmarked (MED certified). The vessel is equipped with double radar, ECDIS, AIS, GPS, auto pilot and a GPS compass and double VHF, Navtex etc. The vessel can carry up to 12 passengers and 2 crew and has the capacity to carry up to 2.5 tonnes of cargo on the foredeck.

Windcat 28 will be starting work immediately on the Greater Gabbard Wind Farm before departing for Oostende for the commissioning of Thornton Bank Phase II Offshore Wind Farm in Belgium next month.

[mappress]

Source: Windcat Workboats, March 26, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free