Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Ireland: Commissioners Unveil Bantry Bay Harbour Dredging Plan
Dredging

April 20, 2012 · about 14 years ago

Ireland: Commissioners Unveil Bantry Bay Harbour Dredging Plan

Bantry Bay Harbour Commissioners Harbour Office has invited bidders for dredging and marine works at the Harbour area. Bantry Bay Harbour Commissioners intends to remove seabed sediment and debris by plough to facilitate the installation of a floating steel pontoon. The work covered by this contract

2 minutes read
  • LinkedIn
  • X
  • Email

Bantry Bay Harbour Commissioners Harbour Office has invited bidders for dredging and marine works at the Harbour area.

Bantry Bay Harbour Commissioners intends to remove seabed sediment and debris by plough to facilitate the installation of a floating steel pontoon.

The work covered by this contract consists of the removal of approximately 4,925m3 of bed sediment and debris by plough and the installation of a floating steel pontoon using chain and anchors. The material removed from the seabed will be transported to a deposit site adjacent to area being ploughed. The level of the material at the deposit site will be maintained below a particular level.

The contractor will be required to keep a record of all dredging operations; this will entail logging the volumes and locations of material removed and the corresponding volumes and locations of deposited material.

Deposition of dredged material in any undesignated area will not be accepted. The pontoon installation will involve the provision of 16 reinforced concrete anchor blocks and installation of the anchor blocks on the seabed.

Anchor chains will then be connected to the anchor blocks and pontoon lugs. The pontoon (supplied by client) will be moored in Bantry Bay for installation. The contractor will also be required to install a 25m aluminium gangway (supplied by client), which will be delivered to site prior to installation.

The deadline for this tender is May 4, 2012.

[mappress]

Dredging Today Staff, April 20, 2012;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1First-of-its-kind marine robotics test and development center opens in Norway
  2. 2Shell ups its production ante with first oil from US Gulf project’s third chapter
  3. 3Germany’s SEFE firms up two-decade-long offtake deal with Canadian LNG project
  4. 4Baker Hughes' subsea systems to help fast-track Cyprus's first commercial gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free