Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›PSA Orders ConocoPhillips to Fix Pressure Relief System on Tor Field
Fossil Energy

April 23, 2012 · about 14 years ago

PSA Orders ConocoPhillips to Fix Pressure Relief System on Tor Field

The Petroleum Safety Authority Norway (PSA) has issued a notification of order concerning non-conformity with requirements in the regulations for the pressure relief system on Tor 2/4 E. Operator ConocoPhillips has been aware of this non-conformity for some time. The notification is based on an indi

2 minutes read
  • LinkedIn
  • X
  • Email

The Petroleum Safety Authority Norway (PSA) has issued a notification of order concerning non-conformity with requirements in the regulations for the pressure relief system on Tor 2/4 E. Operator ConocoPhillips has been aware of this non-conformity for some time. The notification is based on an individual and overall assessment of acceptable operation on Tor 2/4 E.

A pressure relief system is important for safety, and the PSA has decided it necessary to order the operator to stop using all systems which require a functioning pressure relief system on Tor 2/4 E until a solution which satisfies the regulations is in place.

The system on Tor 2/4 E requires manual operation in the field in order to achieve full pressure relief, which is not considered acceptable. Because of the non-conformance, full pressure relief cannot be achieved in certain emergencies.

On stream since 1978, the Tor oil field has been developed with a combined wellhead and processing installation tied back to Ekofisk.

Exemption from technical requirements in the regulations, including the pressure relief system, was sought in 2008 when ConocoPhillips applied for consent to extend the producing life of Tor 2/4 E.

The PSA issued a temporary exemption to the end of 2010, but the operator had not corrected the non-conformity by that date. ConocoPhillips subsequently submitted two exemption applications, which were turned down by the PSA in 2011 and 2012 respectively.

On that basis, the PSA gives notification of the following order :

Pursuant to section 10-1, paragraph 3 of the Petroleum Activities Act, see section 69 of the framework regulations on administrative decisions, section 82, item 2 of the facilities regulations on entry into force, and section 21 on the gas release system in the regulations on safety and communication systems on installations in the petroleum industry adopted by the Norwegian Petroleum Directorate on 7 February 1992, ConocoPhillips is ordered to shut down all systems which require a functioning pressure relief system on Tor 2/4 E. These systems must remain shut down until Tor 2/4 E is equipped with a pressure relief system which complies with the regulatory requirements.

[mappress] Source: Ptil, April 23, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Mazarine taking the helm at Black Sea Oil & Gas as Carlyle and EBRD exit
  2. 2CNOOC’s 2026 run powered by 9 start-ups, 5 new oil & gas discoveries, and 23 appraisals
  3. 3Solstad vessel nets two subsea contracts in Asia Pacific
  4. 4Noble rigs’ $560 million drilling gigs push fleet backlog to $6.7 billion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free