Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›‘Seven Borealis’ Undergoes Final Outfitting in Rotterdam (The Netherlands)
Shipbuilding

May 15, 2012 · about 14 years ago

‘Seven Borealis’ Undergoes Final Outfitting in Rotterdam (The Netherlands)

The ‘Seven Borealis’, Subsea 7’s flag ship, is currently in Rotterdam (the Netherlands) for final outfitting at the Huisman facilities. The vessel is the first customized version of Ulstein Sea of Solutions’ successful SOC 5000 vessel design and fully developed by the Netherlands based Ulstein desig

1 minutes read
  • LinkedIn
  • X
  • Email

The ‘Seven Borealis’, Subsea 7’s flag ship, is currently in Rotterdam (the Netherlands) for final outfitting at the Huisman facilities.

The vessel is the first customized version of Ulstein Sea of Solutions’ successful SOC 5000 vessel design and fully developed by the Netherlands based Ulstein design office. The vessel features an offshore mast crane which can lift 5000 mt and will be capable to perform both J-lay as S-lay operations.

‘Seven Borealis’ is the first Vessel of SOC 5000 Design:

In 2006/2007, Ulstein Sea of Solutions developed the SOC 5000 heavy lift vessel design. Early in 2012, ‘Seven Borealis’, the first vessel based on this design, set sail.

Originally contracted by Nordic Heavy Lift to Sembawang Shipyard in Singapore as a 5000 t heavy lift vessel, it has since been upgraded to a deepwater construction vessel for Subsea 7. Unlike the original SOC 5000 design, the ‘Seven Borealis’ incorporates a centre line pipelay firing line, enabled through lifting the vessel’s entire accommodation block and main crane. The vessel will also be equipped with a J-lay tower. The final outfitting of ‘Seven Borealis’ takes place in the Netherlands, and only a short distance from the designer’s offices.

[mappress]

Source: Ulstein Group, May 15, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Vår Energi bolsters its oil & gas portfolio with wrap-up of Pandion buy
  2. 2LNG-to-FSRU conversion widening Karpowership-backed Kinetics’ gas infrastructure fleet
  3. 3Potential for tidal lagoon in South East Wales being explored
  4. 4After Fugro, TDI-Brooks selected for surveys offshore Timor-Leste

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free