Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›USA: Huntington Ingalls Reaches Construction Milestone on Aircraft Carrier Gerald R. Ford
Shipbuilding

May 25, 2012 · about 14 years ago

USA: Huntington Ingalls Reaches Construction Milestone on Aircraft Carrier Gerald R. Ford

Huntington Ingalls Industries announced yesterday that its Newport News Shipbuilding (NNS) division reached a construction milestone by lowering the final keel section of the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78) into place. Local media were invited to NNS to watch as the 680-metr

2 minutes read
  • LinkedIn
  • X
  • Email

Huntington Ingalls Industries announced yesterday that its Newport News Shipbuilding (NNS) division reached a construction milestone by lowering the final keel section of the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78) into place. Local media were invited to NNS to watch as the 680-metric-ton lower bow unit was joined to the other keel sections in the dry dock.

“The lower bow is a distinctive component of an aircraft carrier,” said Rolf Bartschi, NNS’ vice president of CVN 78 carrier construction . “Its sheer size is indicative of the massive undertaking of this project and the incredible work ethic of the shipbuilders bringing Ford to life. I congratulate the team on yet another major construction milestone.”

Gerald R. Ford is being built using modular construction, a process where smaller sections of the ship are welded together to form large structural units, outfitting is installed, and the large unit is lifted into the dry dock. Of the nearly 500 total structural lifts needed to complete the ship, 390 have been accomplished.

Comprising six steel sections, the lower bow is more than 60 feet tall and is one of the heaviest superlifts to be placed on the ship. Construction of the lower bow superlift, the last major section of the ship below the waterline, began last year.

Gerald R. Ford represents the next-generation class of aircraft carriers. The first-in-class ship features a new nuclear power plant, a redesigned island, electromagnetic catapults, improved weapons movement, an enhanced flight deck capable of increased aircraft sortie rates, and growth margin for future technologies and reduced manning. The keel for Ford was laid in November 2009. The ship is on track to meet its scheduled launch in 2013 and delivery to the U.S. Navy in 2015.

[mappress]

Source: HII, May 25, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free