Advertisement

Clean Fuel

about 14 years ago

Karoon Gas Updates on Boreas-1 Drilling (Australia)

Karoon Gas Australia announced that today, the Boreas-1 well was completing pressure testing of the BOPs on surface. Since the last report, the 12-1/4” hole section was drilled from 3908 m to 4009 m, 9-5/8” casing was run and cemented, and the BOP and marine riser were pulled from the well. The BOPs

1 minutes read

Karoon Gas Australia announced that today, the Boreas-1 well was completing pressure testing of the BOPs on surface.

Since the last report, the 12-1/4” hole section was drilled from 3908 m to 4009 m, 9-5/8” casing was run and cemented, and the BOP and marine riser were pulled from the well. The BOPs were then serviced. Drilling of the 8-1/2” hole section is expected to commence early next week.

The Transocean Legend semi-submersible rig is drilling the exploration well, which is operated by ConocoPhillips. ConocoPhillips is the operator of the jointly held WA-314-P, WA-315-P and WA-398-P Browse Basin permits containing the previously announced Poseidon and Kronos gas discoveries.

Karoon Gas Australia Ltd holds 40% of the permit WA-315-P and WA-398-P, and 90% of permit WA-314-P. Boreas-1 is located approximately 4 kilometres south of Poseidon-1 in WA-315-P on a large tilted fault block which is part of the of the north-east trending structural high of the greater Poseidon structure.

The objective of the well is to test the extent, presence and quality of reservoirs within the Boreas-1 fault block.

[mappress] LNG World News Staff, May 28, 2012

Advertisement

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.