Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›SCHRAMM Group Completes Offshore Logistic for Thornton Bank, Belgium
Offshore Wind

July 10, 2012 · about 14 years ago

SCHRAMM Group Completes Offshore Logistic for Thornton Bank, Belgium

The engineering company NavConsult AWSS GmbH & Co. KG from Brunsbüttel/Germany, completed a comprehensive transport project for offshore wind turbines. Since the foundation in 2006, the planning, consulting and engineering company NavConsult offers high specialized, individual advices for the mariti

2 minutes read
  • LinkedIn
  • X
  • Email

The engineering company NavConsult AWSS GmbH & Co. KG from Brunsbüttel/Germany, completed a comprehensive transport project for offshore wind turbines.

Since the foundation in 2006, the planning, consulting and engineering company NavConsult offers high specialized, individual advices for the maritime industry. The main focus is on the development of tug boats, pontoons and specialized vessels for the offshore business, as well as planning and execution of comprehensive transport and logistic projects.

Such a turn-key transport project was performed by NavConsult, which belongs to the company SCHRAMM group, on behalf of REpower Systems SE for the wind farm Thornton Bank Phase II. The wind farm Thornton Bank is located in the North Sea, about 30 km off the Belgium coast between Oostende and Zeebrügge.

During this extensive project a total of 30 turbines of REpower 6M type were transported. The performance took place in 10 circulations: At the beginning of each trip three hubs and three nacelles were loaded in Bremerhaven. Afterwards the barge was transported to Cuxhaven, where in addition six tower sections have been loaded. Concluding the crossing to Oostende in Belgium took place, where all of the components had been discharged, before the ship went back to Bremerhaven to start the next tour.

At the end of February the first shipment in Bremerhaven started and in the last week the 10th circulation was completed successfully. The project team of NavConsult chartered pontoon Eidebarge 42 and tug boat Claus (shipping company J. Johanssen & Sohn) to perform the project. NavConsult organized, dimensioned and installed the sea fastening on the barge. The company was also responsible for calculations of stability.

The towing company Hans Schramm & Sohn Schleppschifffahrt GmbH & Co. KG, just like NavConsult a company of SCHRAMM group, took over all the welding and lashing work as well as provision of loading personnel including the supercargo in Cuxhaven and Bremerhaven. Furthermore, the charter of the towing equipment and tug assistance with PARAT and MAX was included in the scope of work of Hans Schramm & Sohn Schleppschifffahrt.

Due to the long business relation between the companies of REpower and the SCHRAMM group, this project had been closed successful. All the equipment was delivered in Oostende without any damage or delay. The turnkey solution, processing and experience for this kind of comprehensive projects, which was offered by NavConsult has mainly lead to the success of this project. The transports have contributed to the smooth provision of the components for the construction of the offshore wind farm Thornton Bank Phase II.

[mappress]

Offshore WIND staff, July 10, 2012; Image: RWE

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Woodside passes the baton for offshore gas project to Timor Gap in $200 million deal
  2. 2Fugro wins UXO survey contract for German offshore grid connections
  3. 3Accelerating operational excellence in offshore energy
  4. 4Go-ahead for North Sea wildcat clears path for Equinor’s drilling ops with COSL rig

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free