Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Boskalis Wins Capital Dredging Project in India
Dredging

August 2, 2012 · about 14 years ago

Boskalis Wins Capital Dredging Project in India

Royal Boskalis Westminster N.V. has acquired a contract with port operator Jawaharlal Nehru Port Trust (JNPT) for deepening and widening the port and access channel of JNPT in Mumbai, India. The contract has a total value of approximately EUR 175 million. The dredging work will commence in September

2 minutes read
  • LinkedIn
  • X
  • Email

Royal Boskalis Westminster N.V. has acquired a contract with port operator Jawaharlal Nehru Port Trust (JNPT) for deepening and widening the port and access channel of JNPT in Mumbai, India.

The contract has a total value of approximately EUR 175 million. The dredging work will commence in September 2012 and is expected to take two years to complete.

The expansion comprises the deepening and widening of the 33.5 kilometers’ long access channel, the port basins and turning basins. In total, approximately 67 million cubic meters of sand, silt, clay and rock will be removed. For this project, a jumbo and medium sized trailing suction hopper dredgers will be used in combination with a jumbo cutter suction dredger and a large backhoe.

Jawaharlal Nehru Port is the largest container port in the country with an annual handling capacity of 4.3 million TEU. This volume represents more than 50% of the total quantity of containers that are handled by Indian ports. By deepening the port from the current 11.5 meters to over 14 meters, it will be possible to receive larger types of container vessels and as a result, according to the port operator, the annual capacity will increase to approximately 10 million TEU.

The Boskalis strategy is designed to benefit from the key macro-economic drivers that fuel global demand in our selected markets: global trade, increasing energy consumption, population growth and the challenges of changing climate conditions. This project is driven by the demand for global trade.

[mappress]

Dredging Today Staff, August 2, 2012; Image: Boskalis

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Egypt’s energy infrastructure grows as two new offshore platforms slide into place
  2. 2Seaway7 completes inter-array cable installation at East Anglia Three offshore wind farm
  3. 3'Industry’s first’ energy construction vessel launches one year after construction start
  4. 4QatarEnergy locks in more US LNG through 20-year deal with Woodside

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free