Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Norway: Safety Violations Found at Hammerfest LNG Terminal, PSA Says
Clean Fuel

August 20, 2012 · about 14 years ago

Norway: Safety Violations Found at Hammerfest LNG Terminal, PSA Says

From 12 – 15 June 2012, the Petroleum Safety Authority Norway (PSA) carried out an audit activity related to application and use of risk analyses, and fire load and fire resistance in the process facility at Statoil’s Hammerfest LNG terminal, PSA said in a statement. The objective was to verify that

2 minutes read
  • LinkedIn
  • X
  • Email

From 12 – 15 June 2012, the Petroleum Safety Authority Norway (PSA) carried out an audit activity related to application and use of risk analyses, and fire load and fire resistance in the process facility at Statoil’s Hammerfest LNG terminal, PSA said in a statement.

The objective was to verify that Hammerfest LNG safeguards the regulatory requirements related to barrier management.

Special emphasis was placed on:

Result A serious breach of the regulations was proven in relation to the depressurisation system’s performance.

Based on this, the PSA has notified Statoil of the following order: Based on Section 69 of the Framework Regulations relating to administrative decisions, cf. Section 5 of the Management Regulations – relating to barriers, Section 41 of the Technical and Operational Regulations relating to use of onshore facilities, and Section 23 of the Framework Regulations relating to general requirements for material and information, Hammerfest LNG is ordered to submit a binding, scheduled and detailed plan that will ensure the design and performance of the depressurisation system is verified vis-à-vis the system requirements, cf. Chapter 5.1.1 of the report. Measures that result in considerable risk reduction must be prioritised in the plan.

Until the conditions have been improved, compensating measures must be implemented pursuant to Section 22 of the Management Regulations. An overview of such measures must be sent to the PSA by the deadline stipulated below.

The deadline for complying with the order, including sending an overview of compensating measures, is set at 13 September 2012. We must be notified when the order has been complied with.

Other nonconformities Furthermore, four other nonconformities were identified in relation to the regulations, within the following areas:

Five improvement items were also identified following the activity.

[mappress]

LNG World News Staff, August 20, 2012; Image: Statoil

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free