Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›China: COSCO Cuts Steel for COTEMAR’s Accommodation and Service Platform
Shipbuilding

September 11, 2012 · about 14 years ago

China: COSCO Cuts Steel for COTEMAR’s Accommodation and Service Platform

On September 6, the construction of the world’s most advanced semi-submersible accommodation and service platform N511, designed and built by COSCO (Nantong) Shipyard for COTEMAR, has started in COSCO (Nantong) Shipyard. N511 adopted the OCEAN 500 model provided by GUSTO MSC. The detailed design, pr

2 minutes read
  • LinkedIn
  • X
  • Email

On September 6, the construction of the world’s most advanced semi-submersible accommodation and service platform N511, designed and built by COSCO (Nantong) Shipyard for COTEMAR, has started in COSCO (Nantong) Shipyard.

N511 adopted the OCEAN 500 model provided by GUSTO MSC. The detailed design, production design, equipment procurement, construction, installation and commissioning of the platform are completed by COSCO Shipyard. The platform is 95 metres in length and 67 metres in width. The total height of the platform approaches 60 meters. The platform has a design draft of 8.6 to 20 meters with a maximum displacement of up to 33,300 tons. The platform is equipped with the world’s most advanced DP3 dynamic positioning system and the 8-points anchor mooring positioning system.

The platform can accommodate 990 people at maximum; the dinning hall can hold up to 300 people and can also be used as an emergency shelter. On the platform there are a total of 230 living spaces with windows. The platform meets the relevant standards and requirements of IMO, A468 (XII) Resolution, DNV, ILO, UKCS as well as ABS and the U.S. Coast Guard.

At the steel cutting ceremony, senior leadership of COTEMAR and general manager of COSCO (Nantong) Shipyard Mr. Ni Tao jointly launched the project. Mr. Ni Tao announced the construction of N511 started.

The steel cutting ceremony saw the presence of representatives from COTEMAR, DNV, Commercial Headquarters of COSCO Shipyard Group and the construction team.

[mappress] Source: COSCO, September 11, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Prysmian extends 30-year copper partnership with new supply agreement
  2. 2MISC and QatarEnergy name first of three new LNG vessels for greener seas era
  3. 3Baker Hughes helping chart a course for LNG and monetize Venezuela’s gas reserves
  4. 4Yinson Production and Eni amplifying African FPSO’s gas capacity

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free