Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Germany: MMT Completes Geophysical Cable Route Survey for Amrumbank OWF
Offshore Wind

September 14, 2012 · about 14 years ago

Germany: MMT Completes Geophysical Cable Route Survey for Amrumbank OWF

MMT (Sweden) has recently completed a geophysical cable route survey for the Amrumbank West offshore wind farm (OWF) project for Siem Offshore Contractors GmbH. The geophysical survey was performed by MMT for the entire inner array grid cable route. The geophysical survey included bathymetric and si

1 minutes read
  • LinkedIn
  • X
  • Email

MMT (Sweden) has recently completed a geophysical cable route survey for the Amrumbank West offshore wind farm (OWF) project for Siem Offshore Contractors GmbH. The geophysical survey was performed by MMT for the entire inner array grid cable route.

The geophysical survey included bathymetric and side-scan sonar survey as well as sub-bottom profiling. At first a magnetometer was piggy-tailed behind the towed instruments from the MMT survey vessel IceBeam for detection of unexploded ordnance (UXO). Based on the results of this magnetic anomalies survey a ROV equipped with a gradiometer array was then used for additional target inspections. The overall length of the geophysical survey was 550 km within the OWF area of 36 km². Furthermore geotechnical site investigations have been performed to verify the findings of the geophysical survey, whereby a.o. CPT tests were undertaken.

The OWF is situated within the German Bight sector of the North Sea, north of the island of Helgoland and west of the island of Amrum. Hereby the OWF will consist out of 80 wind turbine generators and shall be interconnected by an inner array grid medium voltage (MVAC) cables with a total length of up to 86km.

[mappress]

Press release, September 14, 2012; Image: mmt

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Tekmar nets €6 million contract extension in offshore wind
  2. 2Japanese shipping major enters CCS realm in Norway
  3. 3Shell bets big on Canada with go-ahead for LNG project expansion, doubling capacity to 28 mtpa
  4. 4Black Sea mega-project narrows first gas window to early 2027 with work in final execution stage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free