News

about 14 years ago

Sevan Brasil Experiences Problems with BOP Control Systems

Sevan Drilling announces that in connection with testing of the blowout preventer (“BOP”) on Sevan Brasil, the company has experienced problems with the BOP control systems. The company is currently preparing to pull the BOP to the surface to investigate and make required repair. Sevan Brasil is con

1 minutes read

Sevan Drilling announces that in connection with testing of the blowout preventer (“BOP”) on Sevan Brasil, the company has experienced problems with the BOP control systems.

The company is currently preparing to pull the BOP to the surface to investigate and make required repair.

Sevan Brasil is contracted to Petrobras S.A. on a six year contract for drilling operations offshore Brazil.

The Rig was accepted by Petrobras on 24 July 2012 and spudded it‘s first well on the 31 August in Santos basin at a water depth of 1 800 m.

[mappress] Press Release, September 24, 2012; Image: Sevan Drilling

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.