Advertisement

Clean Fuel

about 14 years ago

Australia: MEO Updates on Heron South-1 Drilling

MEO Australia Limited announced that at Eni Australia Ltd as operator of the NT/P68 exploration permit had drilled the 311mm (12 ¼”) hole from 3,740m to 3,828mMDRT (metres Measured Depth below Rotary Table), run logs, installed and cemented 244mm (9 5/8”) casing to 3,818mMDRT. There have been no rep

1 minutes read

MEO Australia Limited announced that at Eni Australia Ltd as operator of the NT/P68 exploration permit had drilled the 311mm (12 ¼”) hole from 3,740m to 3,828mMDRT (metres Measured Depth below Rotary Table), run logs, installed and cemented 244mm (9 5/8”) casing to 3,818mMDRT. There have been no reportable incidents.

The forward plan is to test the blow-out preventers prior to drilling ahead in 216mm (8 ½”) hole to Total Depth (TD) at 4,265mMDRT or the gas water contact. At TD a full formation evaluation program will be run including formation pressures and fluid sampling. If warranted, a production test will be run to determine reservoir productivity.

The well was spudded on August 24th 2012 and will be drilled to at least 4,265mMDRT or the gas water contact. The key objectives of the well are to determine the productivity of the Elang-Plover reservoir and the gas composition. The drilling program is expected to take around 60 days.

[mappress] LNG World News Staff, October 03, 2012; Image: MEO

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.