Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›AB Lietuvos Dujos Sets LNG Terminal Related Extra Tariff Component, Lithuania
Clean Fuel

October 26, 2012 · about 14 years ago

AB Lietuvos Dujos Sets LNG Terminal Related Extra Tariff Component, Lithuania

National Control Commission for Prices and Energy set the newly adjusted AB Lietuvos Dujos natural gas transmission and distribution price caps (effective from 1 January 2013 to 31 December 2013) and approved the adjusted version of AB Lietuvos Dujos long-term programme (for 2009–2013) of investment

2 minutes read
  • LinkedIn
  • X
  • Email

National Control Commission for Prices and Energy set the newly adjusted AB Lietuvos Dujos natural gas transmission and distribution price caps (effective from 1 January 2013 to 31 December 2013) and approved the adjusted version of AB Lietuvos Dujos long-term programme (for 2009–2013) of investments in gas transmission and distribution systems.

The natural gas transmission price cap (effective from 1 January 2013) was set at LTL 44.26* / 1000 m3, and the natural gas distribution price cap was set at LTL 179.33 / 1000 m3.

Following the price caps that were set by the NCCPE, the Board of Directors of AB Lietuvos Dujos will subsequently adopt its decision regarding the specific natural gas transmission and distribution service tariffs (effective from 1 January 2013). Then the tariffs will be submitted to the NCCPE for review and final approval.

NCCPE also set the Liquefied Natural Gas Terminal related extra tariff component for the year 2013 to cover part of the costs of the installation of the facilities and the connector of the prospective LNGT.

The aforesaid tariff component was set at LTL 37.53 / 1000 m3. According to the Description of procedures for the administration of funds allocated to cover the costs (or part thereof) related to the construction and operation of the Liquefied Natural Gas Terminal, the LNGT infrastructure and connector (as adopted by the NCCPE), from 2013, the LNGT funds (based on the aforesaid LNGT-extra tariff component) will have to be paid by all users of the Gas Transmission System.

According to the Law on the Liquefied Natural Gas Terminal, the entity appointed in charge of the administration of the LNGT funds, the Transmission System Operator – AB Lietuvos Dujos, will collect the LNGT funds and transfer them to the beneficiary – the company that was appointed by the Government to implement the LNGT Project (AB Klaipedos Nafta).

* LTL 3.45 = EUR 1

[mappress] LNG World News Staff, October 26, 2012; Image: AB Lietuvos Dujos

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free