Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›UK: Agency Invites Bids for Blythe Riverbank R&M Work
Dredging

October 29, 2012 · about 14 years ago

UK: Agency Invites Bids for Blythe Riverbank R&M Work

Environment Agency has invited bidders to submit their offers for the riverbank R&M work at the Solihull area. This work will cover the following: 1. Channel and defence maintenance activities: The control of aquatic weed across the channel, managing vegetation growth on the channel, desilting activ

1 minutes read
  • LinkedIn
  • X
  • Email

Environment Agency has invited bidders to submit their offers for the riverbank R&M work at the Solihull area.

This work will cover the following:

1. Channel and defence maintenance activities:

The control of aquatic weed across the channel, managing vegetation growth on the channel, desilting activities, raised embankment maintenance and blockage removal. The contractor will be given a maintenance regime for each sub reach along the length of the watercourse. The regime will relate to the environmental options and ensure the balance between the need of channel conveyance and the needs of the environment;

2. Incident Response:

The contractors must have the capability to provide incident response. Specifically, contractors will provide operational staff to assist the Environment Agency in responding to flood events. Incident response activities will include 24 hour standby arrangements, deployment of labour during flood incidents, monitoring assets, operating assets and carrying out emergency repairs and emergency blockage removals;

3. Operational Inspections:

Visual inspections of operational structures, defences and channels to be carried out by the contractor to ensure they remain at the required standard. Inspections may include removal of debris or obstructions during site visits;

4. Minor Asset Repairs, improvements to existing structures:

This will include minor building maintenance, minor masonry and concrete repairs, repair and maintenance of access tracks, and health and safety control measures.

The deadline for this tender is November 23, 2012.

[mappress]

Dredging Today Staff, October 29, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Solstad vessel nets two subsea contracts in Asia Pacific
  2. 2Noble rigs’ $560 million drilling gigs push fleet backlog to $6.7 billion
  3. 3Siem's China-built vessel sisters to feature Huisman cranes
  4. 4€3.1 billion Spain-France interconnector is 70% complete

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free