Advertisement

Fossil Energy

about 14 years ago

DNO Doubles West Bukha Oil Production (Oman)

Norwegian oil and gas company DNO International ASA informed today that the just completed West Bukha-4 well located in Block 8 offshore Oman, flowed on a 54/64 inch choke 7,000 barrels of 39º API oil and 15 million cubic feet of gas per day through a test separator. West Bukha-4 will be connected t

1 minutes read

Norwegian oil and gas company DNO International ASA informed today that the just completed West Bukha-4 well located in Block 8 offshore Oman, flowed on a 54/64 inch choke 7,000 barrels of 39º API oil and 15 million cubic feet of gas per day through a test separator.

West Bukha-4 will be connected to the export pipeline system within days and, at the initial test rates, is expected to nearly double current oil production from the West Bukha field to 15,000 barrels per day.

The longest reach well drilled offshore Oman at nearly 6,000 meters, West Bukha-4 targets an area not penetrated by previous drilling and is the second of a three well drilling campaign initiated last year in Block 8. DNO International holds a 50 percent interest in and operates the block containing the West Bukha and Bukha fields and their respective platforms. Korea’s LG International holds the remaining 50 percent interest.

[mappress] November 1, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.