Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Rolls-Royce to Design and Equip Two PSVs for Chinese Customer
Shipbuilding

November 16, 2012 · about 14 years ago

Rolls-Royce to Design and Equip Two PSVs for Chinese Customer

Rolls-Royce, the global power systems company, has won a £12 million order to design and equip two platform supply vessels (PSVs). The vessels will be built at Jiangsu Eastern Heavy Industries Co., Ltd. in China. Rolls-Royce UT 755 LN vessels are designed specifically for transporting solid and liqu

1 minutes read
  • LinkedIn
  • X
  • Email

Rolls-Royce, the global power systems company, has won a £12 million order to design and equip two platform supply vessels (PSVs). The vessels will be built at Jiangsu Eastern Heavy Industries Co., Ltd. in China.

Rolls-Royce UT 755 LN vessels are designed specifically for transporting solid and liquid cargo to and from offshore oil and gas platforms world wide.

Anders Almestad, Rolls-Royce Marine’s President – Offshore said: “This contract further strengthens Rolls-Royce’s presence in China. Jiangsu Eastern Heavy Industries Co., Ltd. is a new client for us in the offshore market. We are very happy to be chosen as a supplier of ship design and integrated systems for these advanced offshore vessels. We look forward to growing our relationship with the yard through this important contract’.”

In addition to the design, Rolls-Royce will supply an extensive range of onboard equipment, including main engines, propulsion system, thrusters, automation and control systems, deck machinery, bulk handling systems, rudders, steering gears and shaft generators.

Since the first UT 755 was delivered in 1996, more than 180 vessels of this popular design have gone into service, or are on order, worldwide. Increasingly efficient hull designs, diesel electric propulsion technology and design solutions that minimise environmental impact and improve the comfort and safety of the crew are hallmarks of the newer UT 755 models.

The vessels are due for delivery in 2014.

[mappress]

Rolls-Royce, November 16, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Connecting the offshore energy industry through smarter travel
  2. 2Borr Drilling’s rig trio lines up jobs in Africa and Europe
  3. 3Inpex broadens its Southeast Asian horizons with two offshore blocks
  4. 4Dutch LNG terminal capacity rises to 20 billion cubic meters with 4th tank

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free