Dredging

about 14 years ago

Corps Introduces Nome Harbor Dredging Plan (USA)

U.S. Army Corps of Engineers has introduced a plan for the dredging project at the Nome Harbor, Alaska. The contractor should: – Perform maintenance dredging of an estimate 34,000 cubic yards of material for the base and each of 4 option years (if awarded); – Perform maintenance dredging of an addit

1 minutes read

U.S. Army Corps of Engineers has introduced a plan for the dredging project at the Nome Harbor, Alaska.

The contractor should:

– Perform maintenance dredging of an estimate 34,000 cubic yards of material for the base and each of 4 option years (if awarded);

– Perform maintenance dredging of an additional 16,000 cubic yards of material in 2013 (if awarded);

– Place the dredged material on the beach in the designated placement area;

– Provide pre and post dredge surveys.

The dredged materials are expected to be fine-grained shoaled material. The contractor should furnish all labor, equipment, supplies, materials, supervision and other items and services necessary to accomplish the work.

A fuel price adjustment for the dredge plant is included.

The estimated cost of this project is between $1,000,000 and $5,000,000.

The estimated award date is February 1, 2013.

[mappress]

Dredging Today Staff, December 18, 2012; Image: mxak.org

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.