Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Elia in Search of Contractors for Submarine Cable System (Belgium)
Subsea

February 15, 2013 · about 13 years ago

Elia in Search of Contractors for Submarine Cable System (Belgium)

Elia is seeking contractors for submarine HVAC cable system of Belgian Offshore Grid (BOG). The scope of the contract entails a complete installed cable system, which involves design, engineering, construction, supply, installation, burial, handling and commissioning of submarine 220KV AC power cabl

1 minutes read
  • LinkedIn
  • X
  • Email

Elia is seeking contractors for submarine HVAC cable system of Belgian Offshore Grid (BOG).

The scope of the contract entails a complete installed cable system, which involves design, engineering, construction, supply, installation, burial, handling and commissioning of submarine 220KV AC power cables including all necessary accessories, such as joints and terminations.

After commissioning, the tenderer can include operations, maintenance and repair. All provisions should be taken in order to install a RTTR (real time thermic rating system). The estimated total length is some 150 to 200 kilometers for the high voltage transmission. The lifespan of the cable system and installations should be 50 years.

The BOG project involves building offshore infrastructures off the Belgian coast in order to connect the wind farms in the Belgian North Sea.

Elia wants to connect future wind farms off the Belgian coast in the North Sea as efficiently as possible for the benefit of the community by creating a genuine offshore grid, thus laying the foundations for a large European offshore grid going forward.

The BOG project consists of 2 Offshore High Voltage Station (OHVS ) platforms, 1 submarine interconnection cable and 4 submarine cables to the onshore grid, of which the connection point is the Stevin location near Zeebrugge. One of the OHVS will be integrated in an artificial offshore island, the other OHVS will be installed on a fixed structure.

[mappress]

Subsea World News Staff , February 15, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Methanol-ready energy subsea construction vessel arrives in Norway for completion
  2. 2Equinor employs 2009-built Odfjell Drilling rig for additional wells
  3. 3Nexans starts manufacturing 525 kV subsea cables for LanWin2 offshore wind grid connection
  4. 4More oil found at permit offshore Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free