Advertisement

Dredging

about 13 years ago

USA: Corps Announces Mississippi River Dredging Plan

U.S. Army Corps of Engineers has announced a plan for the Mississippi River dredging project. The work will consist of placing hydraulically dredged material taken from a borrow area located on the river bottom. Maximum height of the sill will be the point at which the settled dredge material at the

1 minutes read

U.S. Army Corps of Engineers has announced a plan for the Mississippi River dredging project.

The work will consist of placing hydraulically dredged material taken from a borrow area located on the river bottom.

Maximum height of the sill will be the point at which the settled dredge material at the disposal area reaches a maximum height of -45 feet NGVD along the entire length of the sill.

The estimated time for the completion is 89 calendar days. The estimated value of this work is between $5,000,000.00 and $10,000,000.00.

The solicitation for this development program will be issued on or about 11 April 2013.

More info

Advertisement

[mappress]

Source: fbo.gov, March 28, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.