Advertisement

Fossil Energy

about 13 years ago

Norway: Talisman to Drill North Sea Well with Maersk Giant Jack-Up Rig

The Norwegian Petroleum Directorate has granted Talisman Energy Norge AS a drilling permit for well 2/1-16 S, in the Norwegian part of the North Sea. Well 2/1-16 S will be drilled from the Mærsk Giant jack-up rig, at position 56°51’1.72’’ north and 3°18’52.69” east. The drilling programme for well 2

1 minutes read

The Norwegian Petroleum Directorate has granted Talisman Energy Norge AS a drilling permit for well 2/1-16 S, in the Norwegian part of the North Sea.

Well 2/1-16 S will be drilled from the Mærsk Giant jack-up rig, at position 56°51’1.72’’ north and 3°18’52.69” east.

The drilling programme for well 2/1-16 S relates to drilling of a wildcat well in production licence 299. Talisman Energy Norge AS is the operator with an ownership interest of 31.5 per cent. The other licensees are Agora Oil & Gas AS with 28.5 per cent, Dong E & P Norge AS 20 per cent and North Energy ASA 20 per cent.

The area in production licence 299 is located in the southern part of the North Sea near the Gyda field, and consists of parts of block 2/1. Well 2/1 16 S is the second exploration well in this production licence, which was awarded in 2003.

The permit is contingent upon the operator securing all other permits and consents required by other authorities before commencing drilling activities.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.