Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›South Africa: Jumbo Successfully Installs Five Subsea Structures for Ikhwezi Project
Subsea

May 6, 2013 · about 13 years ago

South Africa: Jumbo Successfully Installs Five Subsea Structures for Ikhwezi Project

Last week Jumbo successfully completed the deployment of five subsea structures for PetroSA’s Ikhwezi project, offshore South Africa. The installation of the five structures, weighing between 35 and 185t and measure up to 14 x 8 x 5 ½m, was executed by Jumbo’s DP2 Heavy Lift Vessel Fairplayer. The p

1 minutes read
  • LinkedIn
  • X
  • Email

Last week Jumbo successfully completed the deployment of five subsea structures for PetroSA’s Ikhwezi project, offshore South Africa. The installation of the five structures, weighing between 35 and 185t and measure up to 14 x 8 x 5 ½m, was executed by Jumbo’s DP2 Heavy Lift Vessel Fairplayer.

The project was awarded on an intervention basis and Jumbo once again proved its flexibility and ‘can do’ mentality.

The Ikhwezi project is a subsea development that ties into the FA-platform and is set to play an instrumental role in sustaining the life of PetroSA’s gas-to-liquids (GTL) refinery in Mossel Bay, Republic South Africa. It involves tapping into gas reserves in the FO field, which is located 40km south-east of PetroSA’s F-A production platform off South Africa’s south coast.

Because the project was awarded on an intervention basis Jumbo had very limited time to complete the preparations. The structures had to be installed before the beginning of the winter in South Africa. The weather and sea states off the coast are known to become very hostile in the winter period. The Fairplayer was mobilised in Rotterdam (The Netherlands), e.g. taking Jumbo’s offshore accommodation unit onboard and preparing its Deepwater Deployment System (DDS).

The Ikhwezi subsea installation project confirms Jumbo added-value concept of providing a single solution for loading, transporting and installing subsea structures in water depths up to 3,000m.

[mappress] Press Release, May 06, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Over 500 piles lay the foundation for Poland’s floating LNG terminal (Gallery)
  2. 2Australian gas project enters home stretch as developments in Mexico and US Gulf make new inroads
  3. 3SSE taps Seaway7 for Scotland-bound inter-array cables, foundations
  4. 4Infill drilling ops underway offshore Oman with November start-up in sight

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free