Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›UK: IMCA Releases Guidance on Dynamically Positioned Jack-Up Vessels
Subsea

May 17, 2013 · about 13 years ago

UK: IMCA Releases Guidance on Dynamically Positioned Jack-Up Vessels

An increasing number of members of the International Marine Contractors Association (IMCA) are involved with the offshore renewables sector and for this reason the association has published ‘Guidance for the Positioning of Dynamically Positioned (DP) Jack-up Vessels on and off the Seabed” (IMCA M223

2 minutes read
  • LinkedIn
  • X
  • Email

An increasing number of members of the International Marine Contractors Association (IMCA) are involved with the offshore renewables sector and for this reason the association has published ‘Guidance for the Positioning of Dynamically Positioned (DP) Jack-up Vessels on and off the Seabed” (IMCA M223) and an updated version of their information note The Inspection and Auditing of Manned and Unmanned Barges’. Both are aimed at ensuring and enhancing offshore safety.

“The aim of IMCA M223 is to provide the owners and operators of dynamically positioned (DP) jack-up vessels with guidance to create procedures for going onto and leaving location,” explains IMCA’s Technical Director, Jane Bugler. “A DP system interfaces with the vessel’s propulsion systems to hold the vessel in position against external forces (such as wind and waves) that are acting to move the vessel.

“For DP vessels with jack-up capability – when a vessel moves into position on DP but intends to undertake the work on location as a jack-up vessel – there can potentially be excessive stresses induced into the legs during the transitional period from being on DP to ‘leg touchdown’ to soft pinning of the legs. The first leg contact with the seabed will restrict the vessel’s motion which may indicate a position error to the DP system. This could the lead to an increase of thrust of the vessel’s positioning propulsion systems and consequently may impart these excessive stresses on the legs.”

IMCA M223 has sections on Risk Analysis (vessel characteristics; environmental conditions and loading; site specific assessment integrity; and DP specification and performance); Background Material (that encompasses company procedures; vessel procedures; and information for each location); and covers Procedures for a DP Jack-up Vessel Going on and Leaving Location.

[mappress] Press Release, May 17, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Methanol-ready energy subsea construction vessel arrives in Norway for completion
  2. 2Equinor employs 2009-built Odfjell Drilling rig for additional wells
  3. 3Nexans starts manufacturing 525 kV subsea cables for LanWin2 offshore wind grid connection
  4. 4More oil found at permit offshore Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free