Advertisement

Fossil Energy

about 13 years ago

Santos’ Winchester Well Reaches 3660m MDRT (Australia)

Santos Offshore Pty Ltd, the Operator of the Winchester-1 exploration well being drilled in the Dampier Sub-basin permit WA-323-P, off W. Australia, has announced that at 06:00 hours (WST) on Tuesday, 18 June 2013, the well was at a depth of 3660m MDRT (measured depth below rotary table) and drillin

1 minutes read

Santos Offshore Pty Ltd, the Operator of the Winchester-1 exploration well being drilled in the Dampier Sub-basin permit WA-323-P, off W. Australia, has announced that at 06:00 hours (WST) on Tuesday, 18 June 2013, the well was at a depth of 3660m MDRT (measured depth below rotary table) and drilling ahead.

Operations over the last week have seen the cement plug drilled out and leak-off-testing of the 97/a” casing completed and drilling of the 9. 7/8″ hole section commenced. Planned operations over the coming week are to complete drilling of the 8. 1/2″ hole through the zones of interest. Winchester-1 is a deviated well that is being drilled by the Ensco-109 jack-up rig, in approximately 75m of water and to a planned total depth (TD) of 4803m MDRT. The well is now scheduled to take approximately 80 days from the 7 April spud date to reach TD.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.