Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›UK: Pipeline Engineering to Supply Subsea Cable Protection for Humber Gateway OWF
Subsea

June 25, 2013 · about 13 years ago

UK: Pipeline Engineering to Supply Subsea Cable Protection for Humber Gateway OWF

Pipeline Engineering, a brand of Circor Energy, has won a multimillion dollar contract with E.ON to supply subsea cable protection for the Humber Gateway Offshore Wind Farm. Pipeline Engineering will supply its patented PEFLEX® subsea cable protection system designed to protect array cables on offsh

2 minutes read
  • LinkedIn
  • X
  • Email

Pipeline Engineering, a brand of Circor Energy, has won a multimillion dollar contract with E.ON to supply subsea cable protection for the Humber Gateway Offshore Wind Farm. Pipeline Engineering will supply its patented PEFLEX® subsea cable protection system designed to protect array cables on offshore wind farms.

“The Humber Gateway Project is a significant opportunity for Pipeline Engineering to further progress our expansion into Offshore Wind Energy,” said Andrew Marwood, Commercial Leader. “The cable protection system provides cable protection that is easy to install, and thus, much less costly in comparison to existing market systems. We greatly look forward to continuing to work with E.ON on this major renewable energy project which follows on from our supply of the same system for London Array Offshore Wind Farm Phase 1.”

Construction of E.ON’s £736million Humber Gateway wind farm, which will be built approximately 8km off the Yorkshire Coast, close to the mouth of the Humber Estuary, is underway with completion scheduled for 2015. The wind farm will consist of a 73 turbine array that will generate up to 219MW of electricity, enough energy to power up to 170,000 homes.

The wind farm turbine towers and substations are interconnected via subsea array cables and subsea export cables. These require protecting during deployment and during service life from movement due to wave action and other turbulence across the exposed monopile scour zone. Pipeline Engineering’s Cable Protection System, provides abrasion protection, impact protection, fatigue protection and cable over-bending protection, while also facilitating quicker deployment and reducing installation costs

[mappress] Press Release, June 25, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free