From 5 to 7 June 2013, the Petroleum Safety Authority Norway (PSA) said it has carried out an audit of electrical systems and barrier management at Hammerfest LNG.
The objective of the audit was to verify that Hammerfest LNG met the requirements in regulations relating to barrier management, electrical installations, prevention of incidents and modifications to the facility.
Result No non-conformities with the regulations were identified in connection with the audit.
Eight improvement points were identified. These relate to: