Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Fugro Provides 3D Acoustic Metrology on Spool Piece (USA)
Subsea

August 13, 2013 · about 13 years ago

Fugro Provides 3D Acoustic Metrology on Spool Piece (USA)

Fugro Chance Inc. successfully provided three-dimensional (3D) acoustic metrology on a large 36-inch (91-centimetre) diameter spool piece, despite environmental and logistical challenges. The highly accurate metrology was performed from a platform in Enlace Litoral Tabasco, Gulf of Mexico at a water

1 minutes read
  • LinkedIn
  • X
  • Email

Fugro Chance Inc. successfully provided three-dimensional (3D) acoustic metrology on a large 36-inch (91-centimetre) diameter spool piece, despite environmental and logistical challenges.

The highly accurate metrology was performed from a platform in Enlace Litoral Tabasco, Gulf of Mexico at a water depth of 25 meters.

Active lines from the platform created a noisy auditory environment and the shallow water depth provided additional challenges in the long baseline (LBL) acoustic operations. Once measurements were finalized, the spool piece was welded to the existing pipeline and then set back down on the seabed. With limited tolerance for such a large diameter spool piece to fit into the riser brackets, the delivery of precise measurements was crucial for on-time completion of the project.

This was one of the shallowest 3D acoustic metrology projects Fugro Chance has ever completed and the spool piece was the largest in diameter acoustically measured. The client had allotted 36 hours for completion but Fugro’s fast response time and on-site trouble-shooting enabled completion within 23 hours, saving the client time and money.

[mappress]

Press Release, August 13, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Over 500 piles lay the foundation for Poland’s floating LNG terminal (Gallery)
  2. 2Australian gas project enters home stretch as developments in Mexico and US Gulf make new inroads
  3. 3SSE taps Seaway7 for Scotland-bound inter-array cables, foundations
  4. 4Infill drilling ops underway offshore Oman with November start-up in sight

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free