Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Otto Energy Continues Drilling Ops on Galoc Development, Philippines
Fossil Energy

August 28, 2013 · about 13 years ago

Otto Energy Continues Drilling Ops on Galoc Development, Philippines

Otto Energy Limited, as operator of the producing Galoc oilfield joint venture offshore the Philippines, provides the following update on the Galoc-5H and Galoc-6H drilling campaign in SC14C, part of the Galoc Phase II development approved in 2012. During the period from 0600 hours (AWST) on 21 Augu

2 minutes read
  • LinkedIn
  • X
  • Email

Otto Energy Limited, as operator of the producing Galoc oilfield joint venture offshore the Philippines, provides the following update on the Galoc-5H and Galoc-6H drilling campaign in SC14C, part of the Galoc Phase II development approved in 2012.

During the period from 0600 hours (AWST) on 21 August 2013 to 0600 hours (AWST) on 28 August 2013, completed suspension activities on the G-6H well prior to moving the Ocean Patriot rig to the G-5H well and commencing preparation to drill the 8 ” hole horizontally for approximately 2,400 metres through the reservoir interval prior to running the completion liner and assembly.

The forward plan is to continue drilling the G-5H well 8 ” hole horizontally for approximately 2,400 metres through the reservoir interval and run the completion liner and assembly.

Location and Proposed Depth The Galoc field is located in Service Contract SC14C (Galoc Sub Block) in 290metres of water approximately 65km North West of Palawan Island and 350km south of Manila in the Republic of the Philippines. The Galoc-5Hand Galoc-6Hdevelopment wells are being drilled within the existing producing field that has delivered over 10 MMbbls of production since the field was commissioned in 2008.

After drilling of both Galoc-5Hand Galoc-6His completed, the DOF operated Skandi Hercules construction vessel will be used to install the subsea equipment and complete the hook-up of both wells to the FPSO Rubicon Intrepid. First oil from the Phase II wells is expected in November 2013

[mappress]

Press Release, August 28, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Shell, GTT, and Lloyd’s Register eye hybrid-electric LNG carrier design
  2. 2Equinor to feed Dutch grid with low-emission Norwegian gas through 2031
  3. 3BW Energy locks down multimillion-dollar financing for offshore platform and production growth
  4. 4Tidal energy array in Scotland cleared for construction start

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free