Advertisement

Dredging

about 13 years ago

VIDEO: East Twin River Dredging Project Underway (USA)

Dredging of the East Twin River began earlier this month, about a week sooner than originally planned. Project contractor, Roen Salvage of Sturgeon Bay, mobilized their barges and cranes to the harbor at Two Rivers, and the first truckload of harbor sediments left the downtown harbor dock, bound for

1 minutes read

Dredging of the East Twin River began earlier this month, about a week sooner than originally planned.

Project contractor, Roen Salvage of Sturgeon Bay, mobilized their barges and cranes to the harbor at Two Rivers, and the first truckload of harbor sediments left the downtown harbor dock, bound for the disposal site.

Dredging and hauling activity should continue 24/6 (Sundays off) for the next 4-6 weeks.

The project involves removing an estimated 63,000 cubic yards of material from the federal channel of the East Twin River, from downstream of the 17th Street to the 22nd Street bridge.

[mappress]

Dredging Today Staff, September 2, 2013

Advertisement

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.