Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Leighton Engineering Gets New Contracts in Malaysia
Subsea

November 8, 2013 · about 13 years ago

Leighton Engineering Gets New Contracts in Malaysia

Leighton Engineering has been successful in securing four additional projects in recent months to add to their strong track record in undertaking detailed engineering work from the Engineering Centre of Excellence in Malaysia. Leighton Engineering Director Ian Develin said “The award of these projec

1 minutes read
  • LinkedIn
  • X
  • Email

Leighton Engineering has been successful in securing four additional projects in recent months to add to their strong track record in undertaking detailed engineering work from the Engineering Centre of Excellence in Malaysia.

Leighton Engineering Director Ian Develin said “The award of these projects is a credit to the dedication of our team and we are working hard with our clients to deliver this important engineering work.”

The new projects currently underway include three projects for Petronas Carigali , including:

– Provision of detailed design engineering services for Baram BADP-B revisit project, process topside design to increase production from 5 new wells.

– Provision for detailed engineering design and constructability study to install a new Control Room and deck extension for Bekok – A and Tiong – A upgrade.

– Provision of design verification services for Sumandak Tepi development project infill drilling and process topsides design optimization for increase oil production.

Leighton also has a follow on project for Kencana for the Cendor Bridge in which Leighton will perform all necessary Detailed Engineering designs deemed necessary for the completion of the Bridge Section 2 Redesign Works and an additional crane/slewing jib crane.

Press Release, November 08, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Over 500 piles lay the foundation for Poland’s floating LNG terminal (Gallery)
  2. 2Australian gas project enters home stretch as developments in Mexico and US Gulf make new inroads
  3. 3SSE taps Seaway7 for Scotland-bound inter-array cables, foundations
  4. 4Infill drilling ops underway offshore Oman with November start-up in sight

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free