Offshore Wind

about 13 years ago

VIDEO: DolWin Beta Jacking Operation

DolWin Beta’s topside was placed onto the substructure yesterday. The jacking up of DolWin Beta’s topsides started on December 5. Drydocks World lifted the 10,000-tonne topside of the platform structure to a height of 52.8 metres from the dock bottom. On Saturday, the substructure was moved in posit

1 minutes read

DolWin Beta’s topside was placed onto the substructure yesterday .

The jacking up of DolWin Beta’s topsides started on December 5 . Drydocks World lifted the 10,000-tonne topside of the platform structure to a height of 52.8 metres from the dock bottom. On Saturday, the substructure was moved in position under the topside.

Aibel is designing and building the platform, whilst ABB has overall project responsibility and is supplying cables and the conversion equipment.

Check out the following video showing the DolWin Beta jacking operation:

Offshore WIND Staff, December 10, 2013; Image: Aibel

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.