Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›UTV1200 Trencher Ready for Operation in New Year
Subsea

December 13, 2013 · about 13 years ago

UTV1200 Trencher Ready for Operation in New Year

UTV1200, an SMD built cable burial tool will be ready for operation in the New Year. The vehicle has undergone extensive modifications that have enhanced the configuration to provide a more effective post-lay trenching burial vehicle. The previous configuration of UTV1200 (LBT1) allowed for concurre

2 minutes read
  • LinkedIn
  • X
  • Email

UTV1200, an SMD built cable burial tool will be ready for operation in the New Year. The vehicle has undergone extensive modifications that have enhanced the configuration to provide a more effective post-lay trenching burial vehicle.

The previous configuration of UTV1200 (LBT1) allowed for concurrent trenching (mechanical and jetting) of a pre-loaded product, however after carrying out research the integration of a pre-loaded product was deemed too specialised in the current market, driving the equipment modifications.

Modifications to the vehicle have been made at the Tees Offshore Base, in Middlesbrough. The UTV1200 has a combination of jetting tool packages to meet client requirements where the jetting assembly has been relocated within the core vehicle frame, where the centrally mounted jetting swords optimise steering and handling as well as cable acquisition capability, thus allowing 10m radial manoeuvrability during jet trenching operations. With a rated production speeds greater than 300m/h at 1.6m trench depth for jetting of sands greater than 50KPa. Modifications also include the removal of the cable reel system which has reduced the centre of gravity by reducing the height of the lift frame greatly improving the vehicle stability.

Engineering and design has been completed on a complimentary mechanical chain cutting package in coordination with spoil eduction from the cutting face and the base of the trench formation immediately astern of the cutting tool. Product handling is accomplished by means of two elliptical manipulators to place the product in the cable highway, which also incorporates an automatic cable discharge system. Modular by design, integration is by means of two flange faces; reconfiguration between jetting and mechanical trenching may be performed on location within 36 hours.

Press Release, December 13, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Woodside passes the baton for offshore gas project to Timor Gap in $200 million deal
  2. 2Fugro wins UXO survey contract for German offshore grid connections
  3. 3Accelerating operational excellence in offshore energy
  4. 4Go-ahead for North Sea wildcat clears path for Equinor’s drilling ops with COSL rig

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free