Advertisement

Fossil Energy

about 13 years ago

Eni Completes Blackwood-2 Drilling (Australia)

MEO Australia Limited provides the final update in relation to Blackwood-2 being drilled in NT/P68, operated by Eni Australia Ltd (Eni). Since the last report, in accordance with pre-drilling plans, the well was plugged and abandoned following conclusion of production testing. The rig was released f

1 minutes read

MEO Australia Limited provides the final update in relation to Blackwood-2 being drilled in NT/P68, operated by Eni Australia Ltd (Eni).

Since the last report, in accordance with pre-drilling plans, the well was plugged and abandoned following conclusion of production testing. The rig was released from the drilling location at 14:45 hrs (local time) on 3rd January 2014.

The drilling of Blackwood-2 was an obligation under the NT/P68 Farm-in Agreement (FIA) dated 17th May 2011 between Eni and MEO. Under the FIA and subsequent amendment, MEO’s 50% participating interest share of the well costs were fully carried.

MEO’s CEO and MD Jürgen Hendrich said: “We acknowledge the safe manner in which Eni has conducted the drilling operations and that every effort has been made to ensure the objectives of the well have been met. Our focus will move to integrating the well results to better understand the implications for resource size estimates.”

[mappress] Press Release, January 06, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.