Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Kvaerner to Upend Hull for Aasta Hansteen Spar Platform
Subsea

January 17, 2014 · about 12 years ago

Kvaerner to Upend Hull for Aasta Hansteen Spar Platform

Technip Norge AS has awarded Kvaerner a sub-contract for the Fjord Base and Support Services related to the upending and make ready for mating operations of the substructure for the Aasta Hansteen Spar platform. Kvaerner’s scope includes providing services and assistance to Technip during mooring, u

1 minutes read
  • LinkedIn
  • X
  • Email

Technip Norge AS has awarded Kvaerner a sub-contract for the Fjord Base and Support Services related to the upending and make ready for mating operations of the substructure for the Aasta Hansteen Spar platform.

Kvaerner’s scope includes providing services and assistance to Technip during mooring, upending, ballasting, installation of predefined equipment and preparation of the Aasta Hansteen Spar for mating with the topside. The mooring site will be in Digernessundet, an established deep-water site in the vicinity of the Kvaerner yard at Stord.

The spar is scheduled to arrive at Stord late summer 2015. The spar shall be ready for mating at year end 2015.

With a total length of 198 meters, Aasta Hansteen will be the world’s largest spar platform, and the first of its kind on the Norwegian continental shelf. Statoil has contracted Technip and Hyundai Heavy Industries (HHI) in a consortium to engineer, procure and construct (EPC) the Aasta Hansteen spar substructure. The spar hull will be engineered by Technip in Houston and fabricated by HHI in Ulsan, Korea. The hull will be transported on a heavy lift carrier to Kvaerner’s facilities at Stord.

Contract partner is Kvaerner subsidiary Kværner Stord AS.

Press Release, January 17, 2014; Image: Statoil

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free