Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›OMM Supports Prysmian in HVDC Cable Installation on Sylwin 1
Subsea

February 20, 2014 · about 12 years ago

OMM Supports Prysmian in HVDC Cable Installation on Sylwin 1

Offshore Marine Management (OMM) has successfully completed a contract for providing support services to Prysmian prior to the installation of HVDC cable for the Sylwin 1 project in German waters. Using the DP2 vessel,Vos Sweet, OMM cleared the route proposed for the 160km (77 miles) high-voltage di

2 minutes read
  • LinkedIn
  • X
  • Email

Offshore Marine Management (OMM) has successfully completed a contract for providing support services to Prysmian prior to the installation of HVDC cable for the Sylwin 1 project in German waters.

Using the DP2 vessel,Vos Sweet, OMM cleared the route proposed for the 160km (77 miles) high-voltage direct current export cable that will connect the new wind parks to the onshore grid. This involved identifying and retrieving out-of-service cables along the route for later safe disposal onshore.

OMM conducted mattressing of the existing in-service underwater assets, including telecommunication and electricity cables as well as gas pipelines. Using a remotely operated underwater vehicle launched from the vessel, OMM’s team conducted a detailed survey of the seabed, before identifying the correct position for each mattress and then releasing each into its location. A post-installation survey confirmed that no interference with third-party assets had taken place.

Finally, OMM used theBlue Capellato conduct a pre-lay grapnel run (PLGR) to clear the seabed of debris and other unwanted materials such as fishing lines. This ensured the route for the new Sylwin cable was clear and in good condition for cable installation.

In satisfying Prysmian’s requirements, Chief Operating Officer Eckhard Bruckschen commented: ” Despite challenging weather and some difficult seabed conditions, the out-of-service cables were successfully recovered and the route was proved clear in advance of the commencement of the cable lay. This proves the depth of service to our clients. ”

Press Release, February 20, 2014; Image: Vroon

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free