Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Applicants Seek Corps Permit for Tyringham Dredging Project (USA)
Dredging

February 26, 2014 · about 12 years ago

Applicants Seek Corps Permit for Tyringham Dredging Project (USA)

Daniel H. Schulman 2012 Trust and Jennie A. Kassanoff 2012 Trust are seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the United States in conjunction with excavating sediment in Sodem Pond in Tyringham, Mass. The permit applicants are propos

1 minutes read
  • LinkedIn
  • X
  • Email

Daniel H. Schulman 2012 Trust and Jennie A. Kassanoff 2012 Trust are seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the United States in conjunction with excavating sediment in Sodem Pond in Tyringham, Mass.

The permit applicants are proposing excavating accumulated sediment from the 47,000-square-foot Sodem Pond to maintain existing recreational uses (i.e. swimming, boating and fishing) within the pond. The project will involve the discharge of dredged and/or fill material into approximately 40,000 square feet of waters of the U.S. associated with Sodem Pond.

The applicants propose to dewater the Sodem Pond impoundment using existing water control structures at the downstream dam. Hop Brook will be diverted through an existing low flow channel along the east side of the Sodem Pond impoundment in order to allow the proposed excavation work to be completed “in the dry.” An excavator will be used to remove the accumulated sediments from the dewatered impoundment.

Approximately 1,825 cubic yards of bottom sediments will be deposited at an on-site upland disposal site. This pond dredging work will result in only temporary impacts to Sodem Pond and Hop Brook.

The application for the federal permit was filed with the Corps in compliance with Section 404 of the Clean Water Act, which regulates the discharge or fill of material in U. S. waters, including wetlands.

[mappress]

Press Release, February 26, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Baker Hughes helping chart a course for LNG and monetize Venezuela’s gas reserves
  2. 2Yinson Production and Eni amplifying African FPSO’s gas capacity
  3. 3Sea Lion project on the hunt for new contractors amid Argentine sanction threats
  4. 4Seatrium picks up 9th FSRU conversion job with Karpowership

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free