Nexus Energy Limited has announced that Longtom gas production resumed from the Longtom-4 well, offshore Australia on 11 March.
Further to the operational updates issued on 21 February and 4 March, a Nexus led offshore intervention program started work on the field on 6 March 2014 to locate, inspect and potentially rectify the electrical fault that suspended production at the Longtom gas facility.
The location of the electrical fault has been identified within the Longtom-3 subsea facilities. As a result, the Longtom-3 well has been isolated and is currently not producing.
Related: Nexus, Santos working to bring Longtom production back online