Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›DEA Available for Proposed Fire Island Inlet Stabilization Project (USA)
Dredging

March 18, 2014 · about 12 years ago

DEA Available for Proposed Fire Island Inlet Stabilization Project (USA)

The U.S. Army Corps of Engineers, New York District, announced the availability of the Draft Environmental Assessment (DEA) for the Fire Island Inlet to Moriches Inlet Stabilization Project and the opening of the window for the public to submit written comments regarding it. With the passage of the

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New York District, announced the availability of the Draft Environmental Assessment (DEA) for the Fire Island Inlet to Moriches Inlet Stabilization Project and the opening of the window for the public to submit written comments regarding it.

With the passage of the Disaster Relief Appropriations Act of 2013, the Army Corps has been given the authority and funding to complete ongoing coastal storm damage risk management projects and studies in the Northeast, including the Fire Island Inlet to Moriches Inlet project, which had been previously proposed for construction but was never constructed.

As part of the planning and implementation process for the Fire Island Inlet to Moriches Inlet project, the New York District has updated prior engineering and design efforts, physical surveys, and environmental compliance in putting together the recently completed Draft Hurricane Sandy Limited Re-evaluation Report (HSLRR).

The proposed Fire Island Inlet to Moriches Inlet project calls for the placement of roughly 7 million cubic yards of sand through three contracts to reinforce the existing dune and berm system along the island.

The selected design includes beachfill at Robert Moses State Park, the Fire Island Lighthouse Tract, all of the communities outside of Federal Tracts, and Smith Point County Park. Where feasible, dunes constructed as part of this project will be tied into existing natural dunes in Federal Tracts.

[mappress]

Press Release, March 18, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1GasEntec’s billion-cubic-feet FSRU concept earns go-ahead from Lloyd’s Register
  2. 2Prysmian extends 30-year copper partnership with new supply agreement
  3. 3MISC and QatarEnergy name first of three new LNG vessels for greener seas era
  4. 4Baker Hughes helping chart a course for LNG and monetize Venezuela’s gas reserves

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free