Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›BW Offshore Pens Letter of Award for Catcher FPSO
Subsea

April 1, 2014 · about 12 years ago

BW Offshore Pens Letter of Award for Catcher FPSO

BW Offshore has signed a Letter of Award (LOA) with Premier Oil for a FPSO to operate on the Catcher oil field in the UK North Sea. The LOA will be converted into a final contract subject to final partner sanction and Department of Energy and Climate Change (DECC) approval, expected to be completed

1 minutes read
  • LinkedIn
  • X
  • Email

BW Offshore has signed a Letter of Award (LOA) with Premier Oil for a FPSO to operate on the Catcher oil field in the UK North Sea.

The LOA will be converted into a final contract subject to final partner sanction and Department of Energy and Climate Change (DECC) approval, expected to be completed during Q2 2014. The field is owned by Premier Oil (50%, operator), Cairn Energy (30%) and MOL (20%).

The firm charter period of the contract is 7 years, with extension options. Based on a field life of 10 years, the contract value is USD 2.3 billion including FPSO charter rate and opex.

BW Offshore was awarded a FEED study as part of a funded tender process by Premier Oil in Q4 2012, and has performed extensive engineering studies on the project during 2013 and Q1 2014.

BW Offshore’s scope includes the delivery of the FPSO, mooring system, installation and operation of the unit throughout the charter period. The FPSO will have a processing capacity of 60,000 bopd and a storage capacity of 650,000 bbl. BW Offshore will order a new built hull from Japan for the project, while conversion and integration work will be performed in Singapore. The FPSO shall be ready for production mid-2017.

The project will be financed by a project specific bank facility of USD 800 million and BW Offshore’s existing liquidity.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free