Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Arup to design wellhead platform CGS for Husky’s WREP
Fossil Energy

April 18, 2014 · about 12 years ago

Arup to design wellhead platform CGS for Husky’s WREP

Arup, a multidisciplinary engineering and consulting firm, has been selected by Husky Energy to carry out the detailed engineering design for the White Rose Extension Project concrete gravity structure. Subject to partner, corporate and regulatory approvals, WREP is being developed through the const

2 minutes read
  • LinkedIn
  • X
  • Email

Arup, a multidisciplinary engineering and consulting firm, has been selected by Husky Energy to carry out the detailed engineering design for the White Rose Extension Project concrete gravity structure.

Subject to partner, corporate and regulatory approvals, WREP is being developed through the construction of a wellhead platform, and Arup will be responsible for the DED of the concrete gravity structure (CGS) of the wellhead platform. The CGS will be constructed in a purpose-built dry graving dock and, when completed, will be the first fixed wellhead platform off the coast of Newfoundland & Labrador.

Arup was engaged by Husky Energy to perform a concept study for the wellhead platform and provided project management and design services for the pre-Front End Engineering Design and FEED. This included management of the pre-FEED of the topside drilling and accommodation module supported on the ~72,000m3 CGS platform. The firm’s concept centered on using a dry-build solution for the CGS, which allows the CGS to be constructed entirely onshore and then towed 350 km east of Newfoundland to the site and installed by ballasting on to the seabed.

In addition to project management and design services, Arup provided the following services:

– Offshore engineering,

– Structural, mechanical and electrical engineering,

– Civil engineering,

– Cost estimating,

– Geotechnical engineering,

– Maritime engineering,

– Seismic design.

Key collaborators on the project include Mustang Canada Inc. who completed the drilling and accommodation FEED; Upstream Engineering LLC for the drilling and accommodation concept and pre-FEED; and C-CORE for the definition of sea ice and iceberg loading criteria.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceEquipmentProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Seatrium rakes in millions with Keppel’s RigCo to revive four stranded rigs
  2. 2Rig incident: 110 rescued, 5 still missing after Borr Drilling’s jack-up sinks off Gabon coast
  3. 3Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  4. 4DOF opts to sell 2018-built subsea vessel as attractive offer emerges

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free