Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›‘Innovation’ Uses Large Pile Gripper to Install Westermost Rough Foundations
Offshore Wind

April 18, 2014 · about 12 years ago

‘Innovation’ Uses Large Pile Gripper to Install Westermost Rough Foundations

A 395-tonne pile gripper left the Aelterman quay at the Kluizendok in the port of Ghent in January. The structure, which is 30m long, 25m wide and 20m high, is being used at the Westermost Rough offshore wind farm in the UK. The pile gripper has been installed on the jack-up vessel Innnovation, and

1 minutes read
  • LinkedIn
  • X
  • Email

A 395-tonne pile gripper left the Aelterman quay at the Kluizendok in the port of Ghent in January. The structure, which is 30m long, 25m wide and 20m high, is being used at the Westermost Rough offshore wind farm in the UK.

The pile gripper has been installed on the jack-up vessel Innnovation, and is being used to position foundation piles for offshore wind turbines. It has been installed on heavy-lift jack-up vessel Innovation, one of the largest jack-up vessels in the world. The pile gripper, mounted on the vessel firmly, grasps the 800-tonne foundation piles and positions them in the right spot on the seabed with an accuracy of a few centimetres.

In total, 35 wind tubine foundations will be positioned using this gripper, which can be used for other projects in the future.

Separate components of the structure were assembled at two Aelterman sites (Sint-Amandsberg and Kluizendok) and then put together at Kluizendok. Subsequently, the entire structure was driven on a pontoon using hydraulic vehicles (with 32 independent wheels) and shipped to the UK to be installed on the Innovation, which is too large to enter the port of Ghent.

Press release, April 18, 2014; Image: Shortsea

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Venture Global and ConocoPhillips play the long game with 20-year LNG pact
  2. 2Egypt and Chevron seal Mediterranean oil & gas exploration deal
  3. 3Subsea battery system for offshore wind completes test before deployment
  4. 4$125M purchase: New owner to take over 178-meter subsea vessel next October

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free