Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Third Phase of Round Robin Testing Carried Out
Offshore Wind

April 29, 2014 · about 12 years ago

Third Phase of Round Robin Testing Carried Out

The third step of tidal energy testing called Round Robin took place at CNR-INSEAN this month. Comparisons were based on the performance measurements of the device (torque and thrust) in a flow velocity range from 0.6 to 1.2 m/s, as was done in the first and second leg of testing. The use of the sam

1 minutes read
  • LinkedIn
  • X
  • Email

The third step of tidal energy testing called Round Robin took place at CNR-INSEAN this month.

Comparisons were based on the performance measurements of the device (torque and thrust) in a flow velocity range from 0.6 to 1.2 m/s, as was done in the first and second leg of testing. The use of the same acquisition hardware, software and the presence of Ifremer staff during these tests ensured for the testing protocol was kept constant. The final output of this Round Robin testing is likely to be very strong.

A comparative “Round Robin” testing programme is being conducted by MARINET to test an identical tidal energy model at four different tidal test facilities to characterise and verify the performance behaviour of the test facilities. The facilities involved are CNR-INSEAN (Rome), Strathclyde University (Glasgow), Edinburgh University and Ifremer (Boulogne sur mer).

The findings of these tests will be used to establish normalisation factors to be applied to test results at specific sites in order to benchmark device performance for comparison.

The model used for this comparison is a three blades horizontal-axis turbine designed by Ifremer. This same model was used in each of the three facilities. Comparison will be based on results of the performance assessment of the device characterized by torque and drag measurements.

Press release, April 29, 2014; Image: MARINET

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Venture Global and ConocoPhillips play the long game with 20-year LNG pact
  2. 2Egypt and Chevron seal Mediterranean oil & gas exploration deal
  3. 3Subsea battery system for offshore wind completes test before deployment
  4. 4$125M purchase: New owner to take over 178-meter subsea vessel next October

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free