Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USA: Ridgefield Seeks Corps Permit to Reduce Streambank Erosion
Dredging

April 30, 2014 · about 12 years ago

USA: Ridgefield Seeks Corps Permit to Reduce Streambank Erosion

The Town of Ridgefield is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the United States in conjunction with stabilizing Third Lane Stream to reduce streambank erosion in Ridgefield, Connecticut. The town of Ridgefield is proposing to sta

1 minutes read
  • LinkedIn
  • X
  • Email

The Town of Ridgefield is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the United States in conjunction with stabilizing Third Lane Stream to reduce streambank erosion in Ridgefield, Connecticut.

The town of Ridgefield is proposing to stabilize a segment of Third Lane Stream in order to reduce streambank erosion and prevent further sedimentation into Lake Mamanasco. The work is proposed in Third Lane Stream located opposite of 228 Mamanasco Road in Ridgefield. Proposed work includes regrading approximately 210 feet of the streambed and some minor regrading of the adjacent streambanks.

Filter fabric will be placed across the channel bottom and topped with crushed stone in preparation for a 1-foot thick gabion mattress. The gabion mattress will be filled with stones 4 inches or greater in diameter. Following the placement of the channel bottom mattress, filter fabric will be extended up the streambanks and gabion baskets will be wired into place.

An additional gabion layer will be added, where necessary, to meet the adjacent grade. Fill material will then be placed between the gabion baskets and the streambank in order to fill the voids. Approximately 2,700 square feet of wetland/watercourse will be impacted.

[mappress]

Press Release, April 30, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Venture Global and ConocoPhillips play the long game with 20-year LNG pact
  2. 2Egypt and Chevron seal Mediterranean oil & gas exploration deal
  3. 3Subsea battery system for offshore wind completes test before deployment
  4. 4$125M purchase: New owner to take over 178-meter subsea vessel next October

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free