Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USA: Corps Proposes Stone Revetment to Reduce Hull Coastal Damage
Dredging

May 14, 2014 · about 12 years ago

USA: Corps Proposes Stone Revetment to Reduce Hull Coastal Damage

The U.S. Army Corps of Engineers, New England District, has conducted a feasibility investigation to examine coastal storm damage reduction alternatives for the Department of Conservation and Recreation (DCR) Reservation at Nantasket Beach in Hull, Massachusetts. The Corps’ proposed recommended plan

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District, has conducted a feasibility investigation to examine coastal storm damage reduction alternatives for the Department of Conservation and Recreation (DCR) Reservation at Nantasket Beach in Hull, Massachusetts. The Corps’ proposed recommended plan is to build a 2,100-foot stone revetment to reduce coastal storm damage.

“The study for a coastal storm damage reduction project was conducted to examine solutions to storm damage and flooding at the Nantasket Beach DCR Reservation and backshore properties in the town of Hull, ” said Study Manager David Larsen, of the Corps’ New England District Engineering/Planning Division in Concord, Mass. “ During coastal storms, these properties can sustain damages from wind and wave action.”

The study has been completed to identify and evaluate alternative plans that would reduce or eliminate these damages. Storm waves and winds pose a potential flood hazard to the DCR facilities and commercial properties in the backshore. The project would provide protection for the sea wall and reduce the risk of flooding in this area.

The proposed project for the Nantasket Beach DCR Reservation would provide protection along about 2,100 feet of shoreline along Nantasket Beach through the construction of a stone revetment on the shore side of the sea wall from a point in the vicinity of the intersection of Nantasket Avenue and Wharf Avenue to a point in the vicinity of the intersection of Hull Shore Drive and Water Street.

The recommended Federal project is construction of a 2,100-foot long stone revetment seaward of the sea wall, with an 8-foot wide bench at elevation 12 feet National Geodetic Vertical Datum (NGVD), sloping to the existing beach at a maximum slope of 1 foot on vertical to 3 feet horizontal.

[mappress]

Press Release, May 14, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Venture Global and ConocoPhillips play the long game with 20-year LNG pact
  2. 2Egypt and Chevron seal Mediterranean oil & gas exploration deal
  3. 3Subsea battery system for offshore wind completes test before deployment
  4. 4$125M purchase: New owner to take over 178-meter subsea vessel next October

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free