Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›AWE begins Oi-2 drilling offshore New Zealand
Fossil Energy

June 13, 2014 · about 12 years ago

AWE begins Oi-2 drilling offshore New Zealand

The semi-submersible drilling rig “Kan Tan IV” started drilling the Oi-2 exploration well at 05:30 hours NZDT on Friday, 13 June 2014.

2 minutes read
  • LinkedIn
  • X
  • Email

AWE Limited, as Operator of Petroleum Mining Permit 38158 offshore Taranaki, New Zealand, advised that the semi-submersible drilling rig “Kan Tan IV” started drilling the Oi-2 exploration well at 05:30 hours (5.30am) NZDT on Friday, 13 June 2014.

As at 06:00 hours (6.00am) NZDT today, operations were drilling a 36 inch hole to a planned depth of 230 meters in preparation for the installation of a 30 inch surface conductor.

The Oi-2 exploration well is located approximately 12 kilometres northeast of the Tui Area Oil Fields in water depth of approximately 120 metres. The well objective is to evaluate the hydrocarbon potential of a 4-way dip closed structure similar to the producing Tui, Amokura and Pateke fields and is targeting the same F10 reservoir sandstones.

The Oi-2 exploration well will be drilled vertically to a planned total depth of 3,881 metres and is forecast to take approximately 31 days to complete.

The Oi prospect, in a discovery success case, represents a best estimate Prospective Resource of 11 million barrels of recoverable oil (gross, unrisked P50 estimate). AWE is participating in the Oi-1 exploration well at a reduced equity of 31.25% and has the option to increase its equity participation in any future appraisal drilling and development to 57.5% by exercising existing buyback provisions.

In the event of a commercial discovery, it is envisaged that any subsequent development of the Oi field would involve a tie back to the nearby Tui production facility, the FPSO “Umuroa”, where sufficient production capacity is available.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea gas discovery twice as big after appraisal success with tie-back on the table
  2. 2Huge investment to keep first UK-France interconnector running until at least 2050
  3. 3First-of-its-kind marine robotics test and development center opens in Norway
  4. 4Shell ups its production ante with first oil from US Gulf project’s third chapter

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free