Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Canada: Massive Plan to Save Lake Winnipeg Introduced
Dredging

June 13, 2014 · about 12 years ago

Canada: Massive Plan to Save Lake Winnipeg Introduced

Manitoba is proposing its first comprehensive Surface Water Management Strategy and multi-year surface water management investments to protect Lake Winnipeg and mitigate flood and drought damage, Conservation and Water Stewardship Minister Gord Mackintosh and Infrastructure and Transportation Minist

2 minutes read
  • LinkedIn
  • X
  • Email

Manitoba is proposing its first comprehensive Surface Water Management Strategy and multi-year surface water management investments to protect Lake Winnipeg and mitigate flood and drought damage, Conservation and Water Stewardship Minister Gord Mackintosh and Infrastructure and Transportation Minister Steve Ashton announced.

“ Manitoba faces three water woes: excessive nutrient loading of waterways that is harming Lake Winnipeg, damage from flooding and the risk of drought,” said Minister Mackintosh. “ All three can be mitigated with a new, sustainable approach to managing drainage and investing in flood control infrastructure.”

About 75 per cent of original wetlands in Manitoba have been drained since industrial development began on the prairies, much of that in areas such as the Red River basin, impairing the natural ability of waterways to retain, release and refresh water over time, Minister Mackintosh said, adding this strategy seeks to end further loss of the benefits that wetlands provide and includes a plan to overhaul drainage licensing that would streamline approvals for routine drainage while protecting seasonal wetlands.

Key stakeholders have developed a risk-based approach to drainage licensing which moves the focus of regulation from oversight of routine drainage and water retention to those projects with potentially serious environmental impacts. Routine drainage and water retention works would have clear minimum standards, reduced wait times and associated costs, and earlier start times on the land, the minister said.

Seasonal and permanent wetland benefits would be protected, and breaches would be caught through spot audits and a crackdown on illegal projects, he said, adding violators would face significantly increased fines.

“Manitoba’s proposed regulatory process for drainage and water retention will improve wetland protection and help to mitigate the effects of climate change, flooding and nutrient loading on our lakes,” said Dr. Scott Stephens, director of regional operations – prairies, Ducks Unlimited Canada. “The Manitoba government’s commitment to a no-net loss of wetland benefits approach should be commended as it demonstrates their resolve to mitigate environmental problems that are costing Manitoban’s significantly.”

[mappress]

Press Release, June 13, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Venture Global and ConocoPhillips play the long game with 20-year LNG pact
  2. 2Egypt and Chevron seal Mediterranean oil & gas exploration deal
  3. 3Subsea battery system for offshore wind completes test before deployment
  4. 4$125M purchase: New owner to take over 178-meter subsea vessel next October

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free