Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›OSBIT Equips Technip with Bespoke Cable Handling System
Offshore Wind

July 3, 2014 · about 12 years ago

OSBIT Equips Technip with Bespoke Cable Handling System

Osbit Power supplied a bespoke cable handling system to Technip Offshore Wind, in support of its cable installation operations at Dong Energy’s Westermost Rough offshore wind farm. The quadrant system allows safe and efficient deployment and pull-in of infield cables, managing touch down on the seab

2 minutes read
  • LinkedIn
  • X
  • Email

Osbit Power supplied a bespoke cable handling system to Technip Offshore Wind, in support of its cable installation operations at Dong Energy’s Westermost Rough offshore wind farm.

The quadrant system allows safe and efficient deployment and pull-in of infield cables, managing touch down on the seabed and ensuring protection of the product as it is puled-in to position at the turbine foundation. Installed on the support vessel, the system has been supporting operations since early June, following mobilisation of the deck spread at A&P Tyne.

Designed to ensure safe and efficient cable deployment and pull-in operations, OP’s modular deck spread can be readily mobilised to a range of vessels, ensuring flexibility for future projects. OP’s spread includes cable highways, cable protection quadrant, quadrant trackways, overboarding chute, quadrant handling winch and control unit. The system incorporates a number of safety features such as hydraulic locking of the quadrant at predefined positions, to ensure protection of personnel when the system is under tension during operations. Close cooperation between OP Engineers and Technip’s team was essential as Technip worked towards a challenging mobilisation schedule.

OP’s Managing Director Tony Trap comments: “This is another milestone project for Osbit Power. We have expanded our activities significantly over the past 12 months with a series of contracts delivering a range of back deck and subsea equipment to leading offshore installation contractors. This first contract for a cable deployment system, successfully delivered against very challenging schedule constraints, again demonstrates the strength of the OP team and its ability to cooperatively supply customised equipment spreads in short lead times. We are delighted to have played our part in supporting the installation of infield cables in this important project for Technip Offshore Wind and Dong Energy.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$533 million lands on Arabian Drilling’s backlog for rig quartet deal
  2. 2Constellation’s greener drilling tech fetches ABS go-ahead as duo signs up for decarbonization quest
  3. 3Petrobras taps TechnipFMC for flexible pipe
  4. 4Venture Global and ConocoPhillips play the long game with 20-year LNG pact

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free