Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Iran: Topside for South Pars Phase 12 completed
Fossil Energy

July 8, 2014 · about 12 years ago

Iran: Topside for South Pars Phase 12 completed

A topside destined for Phase 12 of South Pars gas field in southern Iran has been lifted for delivery.

1 minutes read
  • LinkedIn
  • X
  • Email

A topside destined for Phase 12 of South Pars gas field in southern Iran has been lifted for delivery.

The lifting was carried out on Monday at Khorramshahr Yard in southwestern Iran in the presence of senior officials.

The topside has been designed and constructed by Iran’s Offshore Engineering and Construction Company (IOEC) engineers.

The 3,250-ton topside is to be installed within a week.

When platforms A, B and C of Phase 12 of South Pars become operational, Iran’s gas output will rise by 62.5 mcm. Topsides are under construction for other phases of South Pars, the massive offshore gas field shared by Iran and Qatar.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free