Subsea

about 12 years ago

Statoil: Damaged Pipe Causes Production Shut Down on Troll C

Statoil shut down production on the Troll C platform in the North Sea on Sunday 17 August after an inspection programme on the platform detected corrosion damage to a pipe connected to the oil export system. The corroded pipe will be replaced. This is expected to require a 7-day shutdown. Troll C ha

1 minutes read

Statoil shut down production on the Troll C platform in the North Sea on Sunday 17 August after an inspection programme on the platform detected corrosion damage to a pipe connected to the oil export system.

The corroded pipe will be replaced. This is expected to require a 7-day shutdown.

Troll C has a daily equity production of some 58 000 barrels of oil , and exports 8 million cubic metres of gas. In addition some 34 000 barrels of oil and 2 million cubic metres of gas are transported from the Fram field through the Troll C platform.

Press Release, August 20, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.