Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Bang-Up Job Done on Pioneering Offshore Wind Project
Wind Farms

August 29, 2014 · about 12 years ago

Bang-Up Job Done on Pioneering Offshore Wind Project

The companies that installed an innovative foundation on DONG Energy’s Borkum Riffgrund 1 offshore wind farm can mark another great milestone for their businesses after the first offshore wind Suction Bucket Jacket stands at its position. GeoSea carried out the floating load out, transport and insta

1 minutes read
  • LinkedIn
  • X
  • Email

The companies that installed an innovative foundation on DONG Energy’s Borkum Riffgrund 1 offshore wind farm can mark another great milestone for their businesses after the first offshore wind Suction Bucket Jacket stands at its position.

GeoSea carried out the floating load out, transport and installation, while the suction process was done by SPT Offshore. Armour stones will be installed soon by GeoSea’s sister company Tideway.

The installation vessel Pacific Orca , supplied by DONG Energy, is currently demobilizing in Eemshaven.

After installing 77 monopile foundations for Borkum Riffgrund 1 at the end of July, the Pacific Orca demobilized at BOW Terminal and mobilized for the job on the 78th foundation, the suction bucket jacket.

The suction bucket jacket design consists of three legs welded together in a jacket structure, standing on top of three giant suction buckets anchoring the foundation to the seabed. It is a lightweight structure that only requires a single operation when the foundation is installed offshore, reducing the time of the installation and hence contributing to lowering the costs of electricity from offshore wind.

When fully operational in 2015, Borkum Riffgrund 1 will be able to supply green power corresponding to the annual consumption of approximately 320,000 German households.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free